One of those relationship types is the blocks relationship (Blocks, is blocked by).
User Story: 'As a product owner, I need to analyze what the critical path of stories is in my release, so I can more closely track/manage whether we are on schedule or slipping'īackground: Jira has the ability to use links to define relationships between stories.